Messier Marathon 2011

Well we have one of those years happening.
The optimum date for the Messier Marathon occurs on a night (March 18th) when we
have a full moon (I have told you how much I hate the moon , haven’t I?)
Scott proposed that we run it on the 2nd of April which is a good date but we
won’t be able to get all the objectes in one evening.
So in order to get the most out of the cards delt us this year, I propose that
we split the marathon into two evenings. The first date would be March 5th 2011
and the second date would be on the 2nd of April 2011.
Anyone have a better idea or any objections to us doing this? If so you won’t
hurt my feelings to fire back.
Ed

Leave a Reply

Your email address will not be published. Required fields are marked *

Powered by WP Hashcash